Part 2 in a Series on Coating New Concrete Last time we discussed the fact that new, or green, concrete must first dry out before an epoxy coating is applied. This drying process typically takes four weeks, but even longer time periods are required in high humidity or...
stain and seal concrete
[gfx_description _builder_version="3.0.47"][/gfx_description]
What Clients Say About Our Epoxy Floor Installations
Love it! Thank you John and rest of the team for coming in last minute and doing the two garages for us. You guys did an amazing job at an incredible value and I'm confident the job you did will last for years to come! We can't thank you guys enough for how easy it was to work with you, your professionalism, and you're obvious skill. You obviously know your craft. Can't thank you enough and have already started recommending you guys to people we know
Such and amazing experience with California Custom Coatings. I've always wanted an epoxy floor after seeing one at my parents house so when I moved in I knew it was a must. John was super responsive, picked up right away, was able to give me a quote the same day, and fit me into the schedule for install right away. His crew showed up on time and even gave an eta as to when they would be arriving. They checked in periodically throughout the install to make sure I liked how it was looking. I would recommend this company to anyone looking to get an epoxy floor done.
PERFECT! The previous owner had built a structure in the garage and put bolts in the floor which left some holes about 4-inches across. A pretty major mess. However, my Team of Kyle and Igor did an amazing Job of filling the holes to absolute smoothness and the Epoxy floor they installed is perfect--doesn't get any better than a 100% recommendation from me.
